Monday, June 28, 2010

Air Recon Taskings for T.S. Alex 28-29 June

000
NOUS42 KNHC 271500 COR
WEATHER RECONNAISSANCE FLIGHTS
CARCAH, NATIONAL HURRICANE CENTER, MIAMI, FL.
1100 AM EDT SUN 27 JUNE 2010
SUBJECT: TROPICAL CYCLONE PLAN OF THE DAY (TCPOD)
VALID 28/1100Z TO 29/1100Z JUNE 2010
TCPOD NUMBER.....10-027 CORRECTION

I. ATLANTIC REQUIREMENTS
1. TROPICAL STORM ALEX
FLIGHT ONE - NOAA 49
A. 29/0000Z
B. NOAA9 0601A ALEX
C. 28/1730Z..........CORRECTED
D. NA
E. NA
F. 41,000 TO 45,000 FT

FLIGHT TWO - TEAL 70
A. 29/0000, 0600Z
B. AFXXX 0701A ALEX
C. 28/2030Z
D. 21.1N 93.4W
E. 28/2300Z TO 29/0600Z
F. SFC TO 10,000 FT

FLIGHT THREE - TEAL 71
A. 29/1200, 1800Z
B. AFXXX 0801A ALEX
C. 29/0845Z
D. 21.8N 94.2W
E. 29/1100Z TO 29/1800Z
F. SFC TO 10,000 FT

2. SUCCEEDING DAY OUTLOOK: CONTINUE 6-HRLY FIXES.
POSSIBLE G-IV FLIGHT FOR 30/0000Z.

3. REMARKS: NOAA 42 WILL BE DOING RESEARCH FLIGHTS INTO
ALEX WITH TAKEOFFS EVERY 12 HRS FOR THE NEXT TWO DAYS.
(28/0800Z, 28/2000Z ETC.) OPERATING ALTITUDE 12,000 FT.

II. PACIFIC REQUIREMENTS
1. NEGATIVE RECONNAISSANCE REQUIREMENTS.
2. OUTLOOK FOR SUCCEEDING DAY.....NEGATIVE.
JWP


000
NOUS42 KNHC 281430
WEATHER RECONNAISSANCE FLIGHTS
CARCAH, NATIONAL HURRICANE CENTER, MIAMI, FL.
1030 AM EDT MON 28 JUNE 2010
SUBJECT: TROPICAL CYCLONE PLAN OF THE DAY (TCPOD)
VALID 29/1100Z TO 30/1100Z JUNE 2010
TCPOD NUMBER.....10-028

I. ATLANTIC REQUIREMENTS
1. TROPICAL STORM ALEX
FLIGHT ONE - NOAA 49
A. 30/0000Z
B. NOAA9 0901A ALEX
C. 29/1730Z
D. NA
E. NA
F. 41,000 TO 45,000 FT

FLIGHT TWO - TEAL 70
A. 30/0000,0300,0600Z
B. AFXXX 1001A ALEX
C. 29/2200Z
D. 23.5N 94.2W
E. 29/2330Z TO 30/0600Z
F. SFC TO 10,000 FT

FLIGHT THREE - TEAL 71
A. 30/0900,1200,1500Z
B. AFXXX 1101A ALEX
C. 30/0700Z
D. 24.1N 95.3W
E. 30/0830Z TO 30/1500Z
F. SFC TO 10,000 FT

2. SUCCEEDING DAY OUTLOOK: CONTINUE 3-HRLY FIXES.
POSSIBLE G-IV MISSION FOR 01/0000Z.

3. REMARKS: NOAA 42 WILL BE DOING RESEARCH FLIGHTS INTO
ALEX WITH TAKEOFFS EVERY 12 HRS FOR THE NEXT TWO DAYS.
(29/0800Z, 29/2000Z THROUGH 30/0800Z) OPERATING
ALTITUDE 12,000 FT.

II. PACIFIC REQUIREMENTS
1. NEGATIVE RECONNAISSANCE REQUIREMENTS.
2. OUTLOOK FOR SUCCEEDING DAY.....NEGATIVE.
JWP