000
NOUS42 KNHC 271630
WEATHER RECONNAISSANCE FLIGHTS
CARCAH, NATIONAL HURRICANE CENTER, MIAMI, FL.
1230 PM EDT MON 27 SEPTEMBER 2010
SUBJECT: TROPICAL CYCLONE PLAN OF THE DAY (TCPOD)
         VALID 28/1100Z TO 29/1100Z SEPTEMBER 2010
         TCPOD NUMBER.....10-118
I.   ATLANTIC REQUIREMENTS
     1. SUSPECT SYSTEM (NORTHWEST CARIBBEAN)
        FLIGHT ONE -- TEAL 70
        A. 28/1800Z
        B. AFXXX 01GGA INVEST
        C. 28/1530Z
        D. 20.0N 85.0W
        E. 28/1700Z TO 28/2300Z
        F. SFC TO 10,000 FT
        FLIGHT TWO -- TEAL 71
        A. 29/0600,1200Z
        B. AFXXX 0216A CYCLONE
        C. 29/0315Z
        D. 21.5N 84.5W
        E. 29/0500Z TO 29/1200Z
        F. SFC TO 15,000 FT
     2. SUCCEEDING DAY OUTLOOK:
        BEGIN 3-HRLY FIXES AT 29/1500Z IF SYSTEM DEVELOPS.
     3. TASKING FOR AF AND G-IV MISSIONS AT 28/1800Z, 29/06
        AND 1200Z WERE CANX BY NHC AT 1115Z.
     3. REMARK: THE NSF/NCAR G-V WILL FLY A 7 HR RESEARCH
        MISSION INTO AND AROUND THE SUSPECT AREA BETWEEEN
        41,000 AND 43,000 FT WITH TAKEOFF AT 28/1200Z.
II.  PACIFIC REQUIREMENTS
     1. NEGATIVE RECONNAISSANCE REQUIREMENTS.
     2. OUTLOOK FOR SUCCEEDING DAY.....NEGATIVE.
                       WVW
---
000
NOUS42 KNHC 281500
WEATHER RECONNAISSANCE FLIGHTS
CARCAH, NATIONAL HURRICANE CENTER, MIAMI, FL.
1100 AM EDT TUE 28 SEPTEMBER 2010
SUBJECT: TROPICAL CYCLONE PLAN OF THE DAY (TCPOD)
         VALID 29/1100Z TO 30/1100Z SEPTEMBER 2010
         TCPOD NUMBER.....10-119
I.   ATLANTIC REQUIREMENTS
     1. TROPICAL DEPRESSION 16
        FLIGHT ONE -- TEAL 70
        A. 29/1500,1800,2100Z
        B. AFXXX 0316A CYCLONE
        C. 29/1230Z
        D. 24.2N 80.6W
        E. 29/1430Z TO 29/2100Z
        F. SFC TO 15,000 FT
        FLIGHT TWO -- TEAL 71
        A. 30/0000,0300,0600Z
        B. AFXXX 0416A CYCLONE
        C. 29/2115Z
        D. 26.5N 79.8W
        E. 29/2330Z TO 30/0600Z
        F. SFC TO 15,000 FT
     2. SUCCEEDING DAY OUTLOOK: BEGIN 6-HRLY FIXES AT
        30/1200Z IF SYSTEM STILL A THREAT.
     3. REMARKS: THERE ARE NO KNOWN RESERACH MISSIONS
        SCHEDULED AT THIS TIME.
II.  PACIFIC REQUIREMENTS
     1. NEGATIVE RECONNAISSANCE REQUIREMENTS.
     2. OUTLOOK FOR SUCCEEDING DAY.....NEGATIVE.
                       JWP
