000
NOUS42 KNHC 091530
WEATHER RECONNAISSANCE FLIGHTS
CARCAH, NATIONAL HURRICANE CENTER, MIAMI, FL.
1130 AM EDT THU 09 SEPTEMBER 2010
SUBJECT: TROPICAL CYCLONE PLAN OF THE DAY (TCPOD)
VALID 10/1100Z TO 11/1100Z SEPTEMBER 2010
TCPOD NUMBER.....10-101
I. ATLANTIC REQUIREMENTS
1. NEGATIVE RECONNAISSANCE REQUIREMENTS.
2. SUCCEEDING DAY OUTLOOK: PSBL LOW LEVEL INVEST
NEAR 14.0N AND 64.0W FOR 11/1800Z.
3. REMARKS: THE NSF/NCAR G-V WILL FLY 2 A DAY RESEARCH MISSIONS
DEPARTING AT 10/0900Z AND 1700Z INTO THE SAME AREA.
II. PACIFIC REQUIREMENTS
1. NEGATIVE RECONNAISSANCE REQUIREMENTS.
2. OUTLOOK FOR SUCCEEDING DAY.....NEGATIVE.
WVW
Utility Planet is the official blog for the column of the same name in The Spectrum Monitor. It replaces Utility World in the discontinued Monitoring Times magazine. Utilities are all VLF/LF/MF/HF (and sometimes low-band VHF) radio communications except broadcasting, CB, and non-emergency amateur. If you understood the last sentence, you know enough to read this blog.
Showing posts with label research. Show all posts
Showing posts with label research. Show all posts
Thursday, September 09, 2010
Wednesday, September 08, 2010
NOAA Research Tasking September 9
000
NOUS42 KNHC 081430 COR
WEATHER RECONNAISSANCE FLIGHTS
CARCAH, NATIONAL HURRICANE CENTER, MIAMI, FL.
1030 AM EDT WED 08 SEPTEMBER 2010
SUBJECT: TROPICAL CYCLONE PLAN OF THE DAY (TCPOD)
VALID 09/1100Z TO 10/1100Z SEPTEMBER 2010
TCPOD NUMBER.....10-100 CORRECTION
I. ATLANTIC REQUIREMENTS
1. NEGATIVE RECONNAISSANCE REQUIREMENTS.
2. SUCCEEDING DAY OUTLOOK.....NEGATIVE
3. REMARKS:
A. A NOAA P-3 WILL FLY AN 8 HR OCEAN SURVEY RESEARCH
MISSION OVER THE GULF OF MEXICO TOMORROW WITH
TAKEOFF AT 09/1400Z.
B. THE NSF/NCAR G-V RESEARCH MISSION FOR TODAY HAS
BEEN CANCELED.
II. PACIFIC REQUIREMENTS
1. NEGATIVE RECONNAISSANCE REQUIREMENTS.
2. OUTLOOK FOR SUCCEEDING DAY.....NEGATIVE.
SEF
NOUS42 KNHC 081430 COR
WEATHER RECONNAISSANCE FLIGHTS
CARCAH, NATIONAL HURRICANE CENTER, MIAMI, FL.
1030 AM EDT WED 08 SEPTEMBER 2010
SUBJECT: TROPICAL CYCLONE PLAN OF THE DAY (TCPOD)
VALID 09/1100Z TO 10/1100Z SEPTEMBER 2010
TCPOD NUMBER.....10-100 CORRECTION
I. ATLANTIC REQUIREMENTS
1. NEGATIVE RECONNAISSANCE REQUIREMENTS.
2. SUCCEEDING DAY OUTLOOK.....NEGATIVE
3. REMARKS:
A. A NOAA P-3 WILL FLY AN 8 HR OCEAN SURVEY RESEARCH
MISSION OVER THE GULF OF MEXICO TOMORROW WITH
TAKEOFF AT 09/1400Z.
B. THE NSF/NCAR G-V RESEARCH MISSION FOR TODAY HAS
BEEN CANCELED.
II. PACIFIC REQUIREMENTS
1. NEGATIVE RECONNAISSANCE REQUIREMENTS.
2. OUTLOOK FOR SUCCEEDING DAY.....NEGATIVE.
SEF
Subscribe to:
Posts (Atom)